Mill Optimization – Highland Valley Copper

SIZE: $8,000,000
DURATION: 2013 to 2014

Marwest installed the large-diameter pipe required in the renewal of the water-intensive Highland Valley Copper mill.  This work included installation of approximately 9km of carbon steel pipe and HDPE pipe ranging in diameter from 42” to 48”, plus the installation of surge anticipation valves, rupture disks, and upgrades to anchor blocks on existing 30” header pipeline. 