Transmission Pipeline Reinstatement - Fortis BC
SIZE: $8,000,000
DURATION: 2012 to 2013
Marwest installed 4.1 kilometers of 24-inch and 36-inch HP NG pipeline as part of the construction of the South Fraser Perimeter Road project. Work included grading, de-watering, water treatment (44.7 million gallons), installation of pipelines, creek crossings, road crossings, pipe, remove tie-ins and reinstatement of R/Ws and drainage appliances. This project also involved installation and removal of 80,000 tones of preload and access roads.